Pell Cycles

A street campaign that sells the ride before the spec sheet.

  • Client

    Bicycle maker, city bikes

  • What we made

    Campaign line, posters, film, social

  • Timeline

    7 weeks

  • Year

    2025

Commuters cycling into low sun down a tree-lined city street at rush hour.

The brief

Pell makes light, fast city bikes, and its ads read like spec sheets: frame weight, gear ratios, a list of parts. The ask was simple. Make people want the ride before they read a single number.

Two cyclists crossing a cobbled square, long shadows behind them.
A rider's legs and front wheel on a zebra crossing in hard sunlight.
Sun flaring down a pavement where cyclists cast long shadows.

The approach

We rode the routes Pell’s customers ride, at rush hour, and wrote down what it felt like. Nobody talked about gear ratios. They talked about passing traffic, catching the green light and getting there first.

That became one line, “Your street. Your speed.”, set huge across posters that run at the angle of a bike leaning into a turn. The film follows one rider across town in a single take, with the city sliding past at cycling speed.

Every piece carries the same tilt, the same heavy type and one colour, so a poster seen from a bus window still reads as Pell.

Backlit cyclists on a cobbled street in an orange evening glow.

What changed

The line moved off the posters and onto Pell’s shop windows, its delivery vans and the frame of every new bike.

Made by

Joaquín Ferrer, design director at Winsor

Joaquín Ferrer

Design director

Kwabena Owusu, motion lead at Winsor

Kwabena Owusu

Motion lead

Tomasz Wierzbicki, designer, websites at Winsor

Tomasz Wierzbicki

Designer, websites

Fergus Penhaligon, writer at Winsor

Fergus Penhaligon

Writer

Our part

Creative direction, copy, art direction, film direction, motion

Next: Ostra Ferries

Deck binoculars at a ferry's white rail, the next ferry passing on the horizon.

Let’s get moving.

Tell us what you’re making. We take three projects at a time, so we’ll tell you honestly when we can start.

We reply within one working day.

What are we making?

Most projects take 6 to 14 weeks.

We could start next month.

Let’s get moving.

Tell us what you’re making. We take three projects at a time, so we’ll tell you honestly when we can start.

We reply within one working day.

What are we making?

Most projects take 6 to 14 weeks.

We could start next month.

Let’s get moving.

Tell us what you’re making. We take three projects at a time, so we’ll tell you honestly when we can start.

We reply within one working day.

What are we making?

Most projects take 6 to 14 weeks.

We could start next month.

Create a free website with Framer, the website builder loved by startups, designers and agencies.